Preparation Junctions for All-Ceramic CAD/CAM Crown and Bridge Restorations
Rad u časopisuBalkan Journal of Dental Medicine, 20(2), 2016, str. 122–125
Sažetak
Background: The preparation junction type is determined by a number of factors that need to be taken in consideration with CAD/CAM Fixed Prosthodontics: the used material; the condition of the retainer teeth, their periodontium and the occlusion; the design software and the type of drills; the working protocol; the cement and the method of cementation.
Objavljeno u Balkan Journal of Dental Medicine pod licencom CC BY. Autorska prava zadržavaju autori.
Zapis časopisa u DOAJ-u (ISSN 2738-0807), provereno 28.09.2026.
Verzija od zapisa kod izdavačaAutori
Department of Prosthetic Dentistry Faculty of Dental Medicine Medical University Plovdiv, 3 Chr. Botev Blvd., Plovdiv, 4000 Bulgaria
Srodni radovi
Po zajedničkim ključnim rečima.
Evaluation of water absorption and solubility of digitally and conventionally produced temporary fixed materials (2024) Effect of Yb: Fiber laser on surface roughness and wettability of titanium (2022) Success of Complete Denture Treatment, Detailed Investigation of Construction Protocols, Occlusal Schemes and Evaluation Questionnaires (2018) Midline Diastema Closure with Partial Laminate Veneers: A Case Report (2016)